OutageSizer

2026 Database

Independent Power Station & Outage Loadout Matcher — No Brand Bias

Built for 2026 Power Stations Startup Surge Checked How It Works
Quick Scenarios:

1. Your Active Loadout 0

Edit hours, quantities, or click Specs to fine-tune watts & duty cycle.

2. Add Common Appliances

Tap any appliance to add it with realistic surge & compressor duty-cycle defaults.

3. Real-World Physics & Solar

85%
75% (Heavy Loss) 85% (Real-World Avg) 95% (DC / High-Eff)

Accounts for AC inverter self-consumption while powered on.

Run 1,000W+ loads one at a time instead of simultaneously.

Solar Recharge Panels 0 Wh/day
4.5 hrs
0h (Overcast) 3h (Average) 6h (Clear Summer)

Note: Matching automatically caps solar harvest at each station's max solar input rating.

Live Loadout Requirements

Real-world AC power demand for your selected devices

Total Energy Needed
0 Wh
Raw: 0 Wh
Peak Continuous
0 W
Simultaneous draw
Max Surge Load
0 W
Running + startup spike
Solar Offset
0 Wh
No solar panels set
Showing 0 safe matches
Independent Buyer Guide

How Real-World Power Station Sizing Works

Avoid the three most expensive mistakes first-time backup battery buyers make.